banner
Water Supply & Water Resources Engineering Projects
PROJECT NAME & DESCRIPTION LOCATION NAME OF CLIENT AND CONTACT PERSON CONTRACT PERIOD (WITH DATE) COMPLETION PERIOD (WITH DATE)
Supply of Prepayment Meters Abuja World Bank / Federal Ministry of Water Resources Feb. 2018 Aug. 2018
Supply of Electromagnetic Bulk Meters Abuja World Bank / Federal Ministry of Water Resources Feb. 2018 Aug. 2018
Procurement of Domestic Meters Abeokuta World Bank / Ogun State Water Corporation Feb. 2013 Dec. 2013
Procurement of Bulk Meters Abeokuta World Bank / Ogun State Water Corporation Feb. 2013 Dec. 2013
Construction of Sagamu Intake Structure Sagamu World Bank / Ogun State Water Corporation Feb. 2013 Dec. 2013
Rehabilitation of Ogere Water Supply Scheme Ogere World Bank / Ogun State Water Corporation Oct. 2008 March 2012
Construction of Earth Dam Fiditi, Oyo State Ogun-Oshun River Basin Development Authority Nov. 2011
Channelization of Lower Awba Stream University of Ibadan Zoological Garden University of Ibadan May 2012 Oct. 2015
Ajagunmolu Flood and Erosion Control Ijebu-Ode Federal Ministry of Environment Jan. 2011 Dec. 2014
Dredging of River Omi Ogungbade, Oyo State. Federal Ministry of Environment & Habitat May 2012 June 2012
Dredging of River Ijaiye, Abiola Way, Quarry Road. Ogun State Ministry of Environment May 2012 June 2012
Construction of 32nos of Solar Powered Boreholes. Ogun State Ogun State Bureau of Management and Budget Nov. 2009 July 2010
Construction of 3nos of Solar Powered Boreholes. Ogun State Ogun-Oshun River Basin Development Authority Dec. 2009 April 2010
  • Stalked Ductile Iron Pipes

    Stalked Ductile Iron Pipes for Water Distribution

  • Installed High Lift Pump Panel

    Installed High Lift Pump Panel at Sagamu Intake, Water Supply Scheme

  • World Bank Team Inspection

    World Bank Team Inspection of on-going Sagamu Intake, Water Supply Project

  • Water Meter Installation Training

    Training of Ogun State Water Corporation Staff on Water Meter Installation

  • Strategy Session

    Strategy Session on Water Meter Installation

  • Water Meter Installation

    Water Meter Installation in Progress for Ogun State Water Corporation

  • Water Meter Installation

    Water Meter Installation in Progress for Ogun State Water Corporation

  • Laying Of UPVC Pipes

    Laying Of UPVC Pipes in Progress at Ositelu Ogere

  • Laying of UPVC Pipes

    Laying of UPVC Pipes in Progress at Ositelu Ogere

  • 24

    CLAY COMPACTION FOR COT (FIDITI DAM)

  • c22

    CLEARING OF RIVER COURSE (DOWN STREAM) (FIDITI DAM)

  • 34

    CLIENT INSPECTING PROGRESS OF WORK (FLOOD CONTROL SYSTEM) AT OGERE WATER SUPPLY SCHEME BY SATO ENGINEERING NIGERIA LIMITED

  • 23

    STONE PITCHING WORK (FLOOD CONTROL SYSTEM) IN PROGRESS AT OGERE WATER SUPPLY SCHEME BY SATO ENGINEERING NIGERIA LIMITED

  • e02

    EXCAVATION WORK (EROSION CONTROL) IN PROGRESS AT MABUNMI JUNCTION, IJEBU-ODE, OGUN STATE

  • 211

    DUCTILE IRON PIPES BEING OFFLOADED AT OGERE WATER SUPPLY SCHEME BY OUR CRANE LORRY

  • 22

    CONSTRUCTION WORK IN PROGRESS AT OGERE WATER SCHEME OGUN STATE

  • 1

    CONSTRUCTION WORK IN PROGRESS AT OGERE WATER SCHEME OGUN STATE

  • s4
  • s2

    LAYING OF DUCTILE IRON PIPE AT OGERE

  • ds2

    CONSTRUCTED OVERHEAD TANK AT OSHITELU MEMORIAL GRAMMAR SCHOOL AT OGERE

  • saas2

    FOUNDATION WORK FOR 253 M 3 OVERHEAD TANKS IN PROGRESS, OGERE, OGUN STATE

  • 3

    LAYING OF DUCTILE IRON PIPES IN PROGRESS AT OGERE

  • 2

    LAYING OF IRON DUCTILE PIPES IN PROGRESS AT OGERE

  • 92

    EXCAVATION OF TRENCH FOR PIPE LAYING IN PROGRESS AT OGERE

  • 62

    INSTALLATION OF HIGHLIFT PUMP IN PROGRESS AT OGERE

  • nhj

    REHABILITATION OF FILTER BED IN PROGRESS AT OGERE WATER SUPPLY SCHEME

  • c2

    COMPLETED SOLAR POWERED BOREHOLE PROJECT AT PRIMARY HEALTH CENTRE TUBE, OGUN STATE, MDG’S PROJECT.

  • 5

    COMPLETED SOLAR POWERED BOREHOLE PROJECT AT PRIMARY HEALTH CENTRE TUBE, OGUN STATE, MDG’S PROJECT.

  • w4

    COMPLETED SOLAR POWERED BOREHOLE PROJECT AT PRIMARY HEALTH CENTRE IDOGO, OGUN STATE, MDG’S PROJECT.

  • w3

    COMPLETED SOLAR POWERED BOREHOLE PROJECT AT PRIMARY HEALTH CENTRE IFOYINTEDO, OGUN STATE, MDG’S PROJECT.

  • w2

    COMPLETED SOLAR POWERED BOREHOLE PROJECT AT PRIMARY HEALTH CENTRE OTA, MDG’S PROJECT

  • w1

    COMPLETED SOLAR POWERED BOREHOLE PROJECT AT PRIMARY HEALTH CENTRE OTA, MDG’S PROJECT